Study for Power Generating Station

IDS Control System Longevity Study for Power Generating Station

Legacy control system components can lead to failures, unplanned outages, and even long-term shutdowns due to ineffective or inoperable equipment. A large power company contracted IDS to provide a detailed engineering study to evaluate the obsolescence and longevity of the plant’s control system.
Project Duration
2 - 3 months
Date
2017
Call Us For All Your DCS Needs

IDS has Senior Control Engineers dedicated to DCS Engineering
who find effective ways to control system and engineering productivity.