Modernizing a Honeywell TDC 3000

Modernizing a Honeywell TDC 3000 Infrastructure with Honeywell’s World-Class Experion PKS Control System

A large power generating utility came to IDS for assistance migrating their obsolete TDC 3000 control system to a new Honeywell Experion system. Plant personnel wanted to extend the life of their control system, improve troubleshooting and increase system reliability.
Project Duration
18 months
Date
2013
Call Us For All Your DCS Needs

IDS has Senior Control Engineers dedicated to DCS Engineering
who find effective ways to control system and engineering productivity.